Engineering responsibility begins where boundaries are defined. Clarifying the interface between manufacturing scope and environmental reality.

*Manufacturing methods, tooling, and workmanship approaches are treated as internal engineering means and are not part of external responsibility definitions.

1. Why Undefined Boundaries Cause Failure

In bespoke architectural furniture projects, disputes rarely arise from material failure itself, but from ambiguity regarding responsibility.

When engineering boundaries are undefined, performance expectations often expand beyond the system’s designed scope—creating retrospective liability for environmental conditions (such as extreme humidity) never engineered for.

2. Defining the System Boundary

A system boundary defines the physical, environmental, and operational limits within which engineering performance is validated.

  •  
    Material interfaces, joint systems, and architectural connections.
  •  
    Hygroscopic environmental assumptions (Relative Humidity, Temperature, HVAC consistency).
  •  
    Load paths and operational usage limits.
  •  
    Installation sequencing and site readiness.

Boundary Definition Statement:
This document defines engineering boundaries and responsibility interfaces only. It does not describe manufacturing methods, production sequencing, or workmanship ratios. Any reference to materials or processes serves solely to clarify scope limitations, not to imply extended liability.

3. Responsibility Interfaces in Multi-Party Projects

I

Site vs. System

Defining the clash points between factory fabrication tolerances and on-site structural discontinuities.

II

Scope Drift

OE-CORE™ engineering defines explicit interfaces to mitigate planar drift and prevent liability overlap between contractor and manufacturer.

III

Intent vs. Reality

Large-scale bespoke projects involve multiple stakeholders. We bridge design intent with environmental reality through documented constraints.

4. Environmental Assumptions as Engineering Inputs

Performance validation is applicable only within defined environmental parameters. Humidity control, thermal expansion range, and lighting intensity are treated as engineering inputs, not post-delivery variables.

Deviations beyond specified ranges invalidate assumptions regarding finish stack-up & optical flatness.

OE-CORE™ HANDOVER PROTOCOL

5. Installation as a Boundary Condition

Installation is not merely execution—it is a critical boundary transition.

  • Boundary Transition Point Responsibility shifts from fabrication to site integration via specific transport & installation protocols.
  • Pre-Installation Inspection Mandatory criteria to verify site readiness (acclimation) before stress is introduced.
  • Adjustment Limits Defined geometric ranges for on-site calibration and leveling.

Explicit Out-of-Scope Conditions

The following conditions are explicitly classified as external variables and reside outside the engineered system boundary:

  • Uncontrolled site humidity, temperature fluctuation, or HVAC instability beyond documented assumptions.
  • Structural movement, settlement, or deflection originating from architectural or MEP systems.
  • Unauthorized post-installation modification, reinforcement, or refinishing.
  • Use conditions inconsistent with documented operational intent.

6. Misuse, Modification & Scope Drift

Structural and finish integrity performance assumes intended use. Unauthorized modification, reinstallation, or environmental misuse constitutes a boundary breach, not an engineering failure.

7. Engineering Clarity as Risk Control

Defined boundaries protect all parties. They enable accurate specification and fair accountability. OE-CORE™ engineering replaces vague assurances with clear responsibility limits to prevent lifecycle fatigue disputes.